To form a concrete plinth to house a new air system
This project was part of a new air system, designed for industrial use which required a concrete plinth to be formed as a base for all the mechanical equipment required.
Following the strutural engineers design and drawings, we carried out the following works:
- Excavate and cartaway of existing ground
- Supply and lay of MOT Type 1 hardcore, and compacting as required
- Supply and erect timber formwork
- Supply and lay steel reinforcement
- Supply and pour structural concrete
- Backfill and make good around newly formed base